“There’s no place like this place anywhere near this place, so this must be the place”
Halfway River Hot Springs

Gallery 9

Sunday, May 27, 2018

A little over three weeks of rock building. Every seat carefully shaped and fitted. Every stone has it’s place! No rock unturned. This, was a labor of love. Thank you everyone that was a part of this huge project. To make it really happen was an incredible feat. A special thanks to Bob Moody the host of this wonderous place for his deep insight and vision.
Final last days of construction
“There’s no place like this place anywhere near this place, so this must be the place”
Halfway River Hot Springs

Gallery 9

Construction of the 2nd pool

A little over three weeks of rock building. Every seat carefully shaped and fitted. Every stone has it’s place! No rock unturned. This, was a labour of love. Thank you everyone that was a part of this huge project. To make it really happen was an incredible feat. A special thanks to Bob Moody the host of this wondrous place for his deep insight and vision.

Sunday, May 27, 2018