“There’s no place like this place anywhere near this place, so this must be the place”
Halfway River Hot Springs

Gallery 4

Friday May 11, 2018

Continuation of the construction of Pool number 2. The days before the actual pool was constructed, Home Hardware shows up with a load of cement and mortar bags and lumber for construction. Along with twenty or more Wildfire Crew from Nelson, BC, and muscled there way down the mountain to the Hot Springs and covered them all with plastic to keep dry from the freezing pouring rain. Kudos to Crew!
May 11 2018. Only one wild pool down by the river that was continually being re-built as the water was very high.
“There’s no place like this place anywhere near this place, so this must be the place”
Halfway River Hot Springs

Gallery 4

Construction of the 2nd pool

We are adding a few galleries of photos showing the daily construction progress of the lower pool that was added in the Spring. (2018) From the old days of wooden shack and wooden tub, to… two beautiful custom made river-stone pools and a new change room for everyones convenience. This is a couple days into the construction. River was high.